Equipment installation and qualification must be executed for every the manufacturer’s Directions. A prerequisite to qualifying the equipment is definitely the qualification of any utilities supporting the equipment. The VHP decontamination cycle consists of four main steps: Conditioning, Gassing, Decontamination, and Aeration. Before init